Clinical trial rescue

Rescue the trial. Not just the site count.

Clinical trial rescue brings an under-enrolling study back toward plan. We show which of your current sites can actually reach qualifying patients, which new sites and countries can, and what each protocol criterion costs. In days. So the rescue adds sites with patients, not more of the same.

Have the NCT ID? Bring it to the call, or add it in the contact form.

Plan Rescue decision More of thesame sites Sites withcounted patients Months since first site activated
planactualsame kind of sitescounted sites
The problem

Most rescues repeat the mistake that caused them.

When a trial falls behind, the reflex is to add sites. The new sites are usually picked the same way as the first ones: reputation, past trials, a survey answer. So the study pays for activation twice and the curve stays flat. Before anyone adds a site, the question is the one that should have been asked at the start: which sites can actually reach patients who qualify under this protocol?

11%of trial sites never enroll a single patientTufts CSDD [1]
37%of trial sites enroll fewer patients than plannedTufts CSDD [1]
~$40Kdirect trial cost of each day of delay, before lost salesTufts CSDD, 2024 [2]
A rescue, sorted

Every active site gets a verdict. Every new site earns its place.

A performance dashboard tells you which sites are slow. It cannot tell you why. We count the qualifying patients each site can reach, so a slow site with patients gets support, a site with none gets closed, and every site you add has patients behind it.

Keephas the patients, enrolling
Site 0446 qualifying
Site 1139 qualifying
Supporthas the patients, not converting
Site 0752 qualifying
Site 1528 qualifying
Replaceno qualifying patients to reach
Site 020 qualifying
Site 093 qualifying
Site 130 qualifying
Addnew sites, ranked
New site A61 qualifying
New site B44 qualifying
New site C37 qualifying

Illustrative. Counts are qualifying patients each site can reach in the US; outside the US you get ranges.

Before you add a single site

Three questions, in order.

A rescue that skips one of these spends money on the wrong fix.

01

Is the protocol shutting patients out?

If one criterion removes most of the qualifying pool, no new site will fix it. We show what each criterion costs in patients, so an amendment, if you need one, targets the line that matters and nothing else.

UsuallyAn amendment written on instinct, then months of approvals.With usWhat each line costs in qualifying patients, before anyone rewrites it.
02

Can the current sites reach qualifying patients?

Some slow sites have the patients and need help converting them. Some never had them. Counting the qualifying patients each active site can reach separates the two, so support goes where it can work.

UsuallySite self-reports and a ranking of who is slowest.With usCounted qualifying patients per active site, and a verdict for each.
03

Where else are the patients?

New sites, new investigators and new countries, ranked by the qualifying patients they can reach, with the competing trials around them in view. Every addition has to beat the sites it replaces.

UsuallyAnother list of familiar names, activated late and at a premium.With usA short, ranked add-on list, with ranges for countries outside the US.
How a rescue starts

An answer in days, not another feasibility cycle.

  1. Day 0

    A 30-minute call

    Where the study stands, what has been tried, and what the sponsor needs to see.

  2. Day 1

    Share what you have

    The protocol, the NCT ID and the current site list. That is the whole handoff.

  3. 5 business days

    The answer

    Standard turnaround is five business days. When the timeline is tight we can often deliver in about 72 hours.

  4. Then

    You decide

    Keep, support, replace, add, amend. Your team runs the rescue with the evidence in hand.

Side by side

A typical rescue, and a counted one.

Typical rescueCounted rescue
New sites chosen byReputation, past trials, survey answersCounted qualifying patients and the investigator’s record
Current sites judged onEnrollment so farThe qualifying patients they can actually reach
The protocolAmended on instinct, if at allEach criterion priced in patients first
Competing trialsDiscovered at the sitesIn view, site by site, before you add one
Outside the USCountries chosen by habitCountries ranked, with patient ranges
Time to an answerWeeks to scope, weeks to runFive business days, about 72 hours when needed
Who calls us for a rescue

Two seats at the table. One answer.

For CROs

Rescue studies are bids too.

When a sponsor moves a struggling study, the CRO that walks in knowing which inherited sites to keep, which to replace and where the qualifying patients are has the strongest case in the room. We deliver that evidence in your own template, before the award.

How we work with CROs →
For biotech sponsors

Before you fund another round of sites.

Adding sites is the most common rescue, and the most expensive one to get wrong. Get a second set of eyes first: which of your current sites can reach qualifying patients, which new ones can, and whether the protocol is the real bottleneck. In days, alongside your CRO.

How we work with biotech →
What you walk away with

A rescue plan you can defend, site by site.

A

Your current sites, sorted

Keep, support or replace, with the counted qualifying patients each active site can reach behind every verdict.

B

A ranked add-on list

New sites and the investigators behind them, ranked by the qualifying patients they can reach. No ghost sites, no duplicates, every site counted once.

C

The protocol, priced in patients

What each eligibility criterion costs, so an amendment is a decision made on numbers, not a guess that takes months to approve.

D

The competition, in view

The trials recruiting the same patients near your sites, so a new site is not walking into a crowded room.

E

Countries outside the US

Ranked, with qualifying patient ranges, for when the answer is a new country rather than a new site.

F

Ready for the sponsor or the board

Slides and a workbook in your template, with the reasoning shown for every site.

FAQ

Clinical trial rescue, answered.

What is clinical trial rescue?

Clinical trial rescue is the work of bringing an under-enrolling or off-track study back toward its plan: finding out why enrollment stalled, then fixing the sites, the countries, the protocol or the vendor. Most rescues add sites. The ones that work add sites that can actually reach patients who qualify under the protocol.

When should a trial be rescued?

As soon as enrollment is clearly behind plan and the reason is not obvious. A study a few months behind has far more options than one a year behind, and every day of delay has a direct cost: about $40,000 a day on average, according to Tufts CSDD.

How do you rescue an under-enrolling clinical trial?

Answer three questions in order. Is the protocol shutting patients out? Can the current sites reach qualifying patients? Where else are the patients? Then keep the sites that can enroll, support the ones with patients who are not converting, replace the ones with none, and add sites chosen on counted patients, not on reputation.

Should we amend the protocol or add sites?

It depends on the bottleneck. If one criterion removes most of the qualifying pool, new sites will not fix it. If the pool is there but your sites cannot reach it, an amendment will not fix it. We show both in patients, so the decision rests on numbers.

How fast can you deliver a rescue answer?

Standard turnaround is five business days from receiving the protocol. When the timeline is tight we can often deliver in about 72 hours.

Do you replace our CRO?

No. We are not a CRO and we do not run trials. We give the sponsor or the CRO the site, investigator and protocol answer, and their team runs the rescue with it.

Can a CRO use this to win a rescue study?

Yes. When a sponsor moves a struggling study, the CRO that shows which inherited sites to keep, which to replace and where the qualifying patients are brings the strongest bid. We deliver it in your own template. How bid defense works →

Is this an enrollment forecast?

No. You get counted qualifying patients per site in the US, ranges outside the US, and the investigator behind each site. How fast a site enrolls also depends on its team and the study, so we show the evidence, not a forecast. It comes from real-world data, verified, not scraped.

Behind on enrollment?

Bring the NCT ID. Leave with a plan.

Thirty minutes with Dustin on where the study stands. Then the answer in days: which sites to keep, which to replace, and where the qualifying patients are.

  1. Tufts Center for the Study of Drug Development, site enrollment performance across about 16,000 sites, reported by Fierce Biotech.
  2. Tufts CSDD, the cost of a day of delay in drug development, August 2024: about $40,000 in direct trial costs per day, averaged across phases.